Constant Construction A crew member works at a 24-hour construction site at the Miami Beach Convention Center in Florida to turn the facility into a 450-bed hospital to help treat COVID-19 patients, April 9, 2020. SHARE: Download: Full Size (0.28 MB) Tags: Health, corps of engineers, Coronavirus Credit: Brigida Sanchez, Army Corps of Engineers VIRIN: 200409-A-AZ289-1228B.JPG Photo Gallery